Wednesday, May 5, 2010

Redefined Plan and Design Plus Products to be integrated

Hey Guys

This past week Ive been back to the drawing board refining my theatre design from the interim presentation. I'm still working on a few drawings/ sketches which i will scan and upload tomorrow. The core changes since week 8 include
:top level of theatre to be removed and fully opened into one larger theatre space with only small mezzanine floors.
:the ground entry has been moved between the arches to create a greater aesthetic and ground movement plan.
:minor changes of floor plans layouts and integrate spaces

Some products I'm proposing on including in my design at this stage include:

Stage 1:

:Lotus Doors and Windows- Glass-Stax as entry doors for ground level. this would allow to fully open the space to greaten effect and movement.
http://www.lotusdoors.com.au/glasstax/index.html:Musion eyeliner 3d projection product

:Musion eyeliner- peppers ghost 3d projection technology (this is the core digital technology theme of theatre and is what the theatre layout is developed around)
http://www.eyeliner3d.com/

I'm still working on finding an available exterior skin facade around my levels. hopefully i can shed further light on this tomorrow when i upload my sketch plans

until then
Mitch out

No comments:

Post a Comment