This past week Ive been back to the drawing board refining my theatre design from the interim presentation. I'm still working on a few drawings/ sketches which i will scan and upload tomorrow. The core changes since week 8 include
:top level of theatre to be removed and fully opened into one larger theatre space with only small mezzanine floors.
:the ground entry has been moved between the arches to create a greater aesthetic and ground movement plan.
:minor changes of floor plans layouts and integrate spaces
Some products I'm proposing on including in my design at this stage include:
Stage 1:
:Lotus Doors and Windows- Glass-Stax as entry doors for ground level. this would allow to fully open the space to greaten effect and movement.
http://www.lotusdoors.com.au/glasstax/index.html:Musion eyeliner 3d projection product
:Musion eyeliner- peppers ghost 3d projection technology (this is the core digital technology theme of theatre and is what the theatre layout is developed around)
http://www.eyeliner3d.com/
I'm still working on finding an available exterior skin facade around my levels. hopefully i can shed further light on this tomorrow when i upload my sketch plans
until then
Mitch out
No comments:
Post a Comment